
Poprzedni odcinek
S01E15 - "Episode 15"
Wyemitowany Sep 15, 2002, 11:00 AM
Następny odcinek
Serial zakończony
Opis
Odcinki (1 Sezony · 15 Odcinków)
Episode 1
Mark Evans begins building his home kit chopper before attempting his helicopter rating in Arizona.
Sep 1, 2002
30 min
Episode 2
Mark Evans begins building the helicopter airframe and discovers the principles of helicopter flight.
Sep 2, 2002
30 min
Episode 3
The airframe is complete and Mark turns his attention to the tail boom before beginning his helicopter flight training.
Sep 3, 2002
30 min
Episode 4
Mark begins the manufacture of the main rotor shaft before getting to grips with training on the controls and throttle.
Sep 4, 2002
30 min
Episode 5
Mark installs the engine in his home kit helicopter and learns how to counter 'dead man's curve' - a potentially fatal beginner's mistake.
Sep 5, 2002
30 min
Episode 6
Mark's helicopter is ready for the tail rotor drive and the clutch, and he learns how to deal with engine failure and autorotation.
Sep 6, 2002
30 min
Episode 7
The exhaust and cooling systems are added to Mark Evan's helicopter, and he learns how to take off from hover position and from the ground.
Sep 7, 2002
30 min
Episode 8
Mark fits the exhaust, fuel system, fuel pumps and pressure regulator to his helicopter, and learns flying level and straight, to slip and to skid.
Sep 8, 2002
30 min
Episode 9
Mark turns his attention to the avionics and instrument panel, and learns about the most important instruments he needs to fly a helicopter.
Sep 9, 2002
30 min
Episode 10
Mark learns how to climb and descend before installing the lights, navigation system and computer into his home-kit helicopter.
Sep 10, 2002
30 min
Episode 11
Mark turns his attention to the body panel and back seats, before learning about landing and set downs.
Sep 11, 2002
30 min
Episode 12
The main rotor blades are fitted to Mark Evans's home-made helicopter. And in his helicopter-flying lesson he learns all about taxiing.
Sep 12, 2002
30 min
Episode 13
Mark Evans takes to the skies in his chopper to practise the quick stop. Back on the ground he installs the rigging into his home-made kit helicopter.
Sep 13, 2002
30 min
Episode 14
Mark paints the bodywork of his helicopter and installs the upholstery, before taking to the sky in another chopper to complete a circuit.
Sep 14, 2002
30 min
Episode 15
We follow Mark as he reveals the finished home-kit helicopter and takes it into the skies for its first glorious flight. Last in series.
Sep 15, 2002
30 min






